Home/Northeast News/Story #2708
Northeast News 3 MIN READ 298 READS

NFR revamping infrastructure of rolling stock workshops

nfr revamping infrastructure of rolling stock workshops

With the aim to improve passenger safety and comfort, N. F. Railway has taken major steps by replacing the existing conventional rakes with the Linke Hofmann Busch (LHB) design rakes.

The proliferation of DEMU has also been done to ensure better passenger services. Higher number of wagons have also been introduced in the system to cater to the ever increasing freight demands in the North-eastern region.

An official release said, with the introduction of these modern coaches and wagons, maintenance methodology and capacity also need to be augmented.  Various infrastructural developmental works are being undertaken at the rolling stock workshops under NFR for advanced maintenance and overhauling of rolling stocks.

The two vital workshops i.e. New Bongaigaon and Dibrugarh under the territory of N. F. Railway are delivering higher quantity and quality turnouts months after month. For further enhancing the turnout quantity with superior amenities and safety measures of rolling stocks both the workshops have undertaken several infrastructure augmentation works.

Investments to the tune of Rs 70 crs has been done at the largest rolling stock workshop of NFR, i.e. New Bongaigaon, to cope with the ever increasing demand of rolling stock maintenance. Work for a new shed for refurbishing of LHB coaches has been started at New Bongaigaon. Another new shed with requisite facilities for Periodical Overhauling (POH) of DEMU/MEMU has also been approved for New Bongaigaon workshop.

To increase the goods wagon maintenance capacity, work for extension of wagon support shop has also been sanctioned.  State of the art disassembly and assembly system for LHB trolleys will also be implemented here.

Similarly, investments of Rs 55 crore are being done for Dibrugarh workshop also. For developing the facilities for POH of LHB coaches and increase turnout capacity, work of a new shed has been completed here.  Another work for enhancement of infrastructure for increasing POH capacity of LHB coaches is under execution.

The narrow gauge heritage workshop at Tindharia has also been targeted for uplifting. Investments to the tune of Rs 4 crore are being here. New machines and restoration of heritage value will be the main focus.

The various developmental works at the mechanical workshop will not only improve the safety of railways operations but will also benefit the passengers travelling by trains. Passengers will be provided with quality amenities and safer travel experience with the introduction of upgraded infrastructure at workshops.

Share this story:
24/7 TRIPURA COVERAGE
Stay Updated with Tripura Times

Bookmark this page and follow Tripura's first English daily for ground-truth reporting.

More in Northeast News
TODAY'S EDITION

Daily ePaper

Read the exact print edition replica of Tripura Times anytime on mobile, tablet, or desktop.

Access ePaper
Join 100K+ Tripura Times Readers

Get real-time breaking alerts directly on your favorite social platforms.

Home Tripura NE ePaper
Link copied to clipboard!